The Belagavi district administration is gearing up to lay the foundation stones for three long-awaited infrastructure and healthcare projects—worth a combined ₹620.6 crore—during the upcoming winter session of the Karnataka State Legislature, which begins at Suvarna Vidhana Soudha on December 2.
The three flagship projects slated for launch are a multi-tier city flyover, a new integrated Deputy Commissioner’s office complex (‘Praja Soudha’), and a regional branch of the Kidwai Cancer Hospital.
According to sources in the Deputy Commissioner’s office, officials are planning to hold the groundbreaking ceremonies in the presence of Chief Minister D.K. Shivakumar.
District In-charge Minister Satish Jarkiholi confirmed that most administrative, land acquisition, and technical hurdles that had previously stalled the works have now been resolved.
While a formal invitation has been extended to the Chief Minister, confirmation from his office is awaited, and the exact dates for the ceremonies will be finalized based on his schedule during the session.
Key Highlights of the Three Projects
1. Multi-Tier Elevated Corridor (Flyover) — ₹450 Crore Aimed at decongesting Belagavi’s busiest commercial and transit hubs, the ₹450-crore elevated corridor will span roughly 7.79 km across key city junctions.
- Alignment & Scope: Starting near Sankam Hotel on NH-48 in Gandhinagar, the corridor will run through Samrat Ashok Circle, the Central Bus Stand (CBT), Sangolli Rayanna (RTO) Circle, and Kittur Rani Channamma Circle up to Dharmaveer Sambhaji Maharaj Chowk, with connecting arms extending toward Mahantesh Nagar, BIMS Hospital, and Club Road.
- Execution: The Public Works Department (PWD) will execute a 6,678-metre stretch supported by 167 pillars, while the National Highways Authority of India (NHAI) will construct an adjoining 1,112-metre section on 22 pillars. Preliminary road markings and utility mapping have already been carried out along the route.
2. Kidwai Cancer Hospital — ₹130 Crore To spare oncology patients across North Karnataka from traveling to Bengaluru for specialized care, a 100-bed branch of the Kidwai Memorial Institute of Oncology will be established on the Belagavi Institute of Medical Sciences (BIMS) district hospital premises.
- Background & Funding: Although the state government had initially allocated ₹50 crore in the 2022–23 budget, the ₹130-crore project faced prolonged delays over site selection after an earlier proposal at Vadgaon was dropped in favor of the BIMS campus. With land and support infrastructure finalized inside the district hospital campus, construction is set to move forward.
3. ‘Praja Soudha’ Integrated DC Office Complex — ₹40.6 Crore Designed to consolidate scattered district-level departments under a single roof, the new Deputy Commissioner’s office complex—officially titled Praja Soudha – Zilla Adalita Kendra—will be constructed within the existing DC office campus after demolishing outdated structures.
- Design & Facilities: Blending modern utility with traditional Karnataka institutional architecture featuring ornamental columns and a grand central dome, the six-level (Basement + Stilt + Ground + 3 floors) structure will stand 31.55 metres tall.
- Key Offices: Along with the offices of the Deputy Commissioner, Additional DC, Regional Commissioner, and Assistant Commissioner, the complex will house Bhoomi Kendra, Nadakacheri, a Sakhi Room, the Cyber Crime Police wing, a 125-seat multipurpose hall, and basement/stilt parking. The PWD has targeted an 18-month completion timeline for the project.





