Filter posts by category

Belagavi Flyover Project: Soil Testing Begins; 220 Trees Set for Translocation

BELAGAVI — In a major step toward easing the city’s traffic congestion, the long-awaited Belagavi flyover project has moved into action. Belagavi Deputy Commissioner (DC) Mohammad Roshan provided key updates regarding the ₹270 crore project, confirming that tenders have been

Belagavi Flyover Project: Soil Testing Begins; 220 Trees Set for Translocation Read More »

Dharwad–Belagavi Rail Project : MB Patil Directs Infra Secretary to Resolve Land Acquisition Issues

Karnataka Minister for Infrastructure Development M.B. Patil has directed Dr. R. Vishal, Secretary of the Infrastructure Development Department, to personally visit Mummigatti near Dharwad to address lingering land acquisition issues and fast-track the direct Dharwad–Belagavi railway line project. The directions

Dharwad–Belagavi Rail Project : MB Patil Directs Infra Secretary to Resolve Land Acquisition Issues Read More »

Belagavi Smart City Limited Hiring Candidates for a Post Under CITIIS 2.0

BELAGAVI — Belagavi Smart City Limited (BSCL) has officially released a recruitment notification inviting applications for the post of Project Coordinator on a contractual basis for its ongoing CITIIS 2.0 initiative. According to the official notification, there is 01 vacant

Belagavi Smart City Limited Hiring Candidates for a Post Under CITIIS 2.0 Read More »

Urban Development Minister Inspects STP, SWM and Water Plant Projects in Belagavi

Karnataka Minister for Urban Development, Dr. Yatindra Siddaramaiah, conducted an extensive inspection of ongoing developmental and civic infrastructure projects across Belagavi City on Tuesday, July 28. Following the site visits, the Minister chaired a comprehensive progress review meeting at the

Urban Development Minister Inspects STP, SWM and Water Plant Projects in Belagavi Read More »

KSR Bengaluru – Belagavi Vande Bharat Express Arrives Belagavi at 3 AM After 4.5-Hour Delay

Ongoing engineering and non-interlocking works at Londa Junction caused severe rail disruptions on the Belagavi route, impacting both inbound and outbound train services. Passengers aboard the inbound Train No. 26752 KSR Bengaluru–Belagavi Vande Bharat Express endured a long delay, with

KSR Bengaluru – Belagavi Vande Bharat Express Arrives Belagavi at 3 AM After 4.5-Hour Delay Read More »

‘Greater Belagavi’ Corporation status : KRV Submits Memorandum to Minister

Highlighting the rapid expansion of Belagavi—often referred to as the Gateway for North Karnataka and Karnataka’s proposed second capital—activists from the Karnataka Rakshana Vedike (KRV) submitted a memorandum to Minister for Urban Development, Yatindra Siddaramaiah, calling for urgent government intervention

‘Greater Belagavi’ Corporation status : KRV Submits Memorandum to Minister Read More »

Passengers Frustrated as Belagavi–Bengaluru Vande Bharat Express Delayed by 3 Hours

Daily commuters and long-distance travelers were left frustrated today after Train No. 26751 Belagavi–KSR Bengaluru Vande Bharat Express was rescheduled by 192 minutes (3 hours and 12 minutes) from its origin station at Belagavi (BGM). The delay was caused by

Passengers Frustrated as Belagavi–Bengaluru Vande Bharat Express Delayed by 3 Hours Read More »

Belagavi–KSR Bengaluru Vande Bharat Express Rescheduled; Departure Delayed by more than 3 Hours

Passengers travelling on the Belagavi – KSR Bengaluru Vande Bharat Express (Train No. 26751) faced inconvenience today as the premium train service was rescheduled by 3 Hour 12 Minutes from its origin station. According to railway updates, the train—which usually

Belagavi–KSR Bengaluru Vande Bharat Express Rescheduled; Departure Delayed by more than 3 Hours Read More »

NWKRTC Operates New Premium ‘Rajaratha’ AC Sleeper Bus Service Connecting Chikkodi, Belagavi, and Bengaluru

The North West Karnataka Road Transport Corporation (NWKRTC) has introduced a new premium Rajaratha AC Sleeper bus service operating on the high-demand interstate route connecting Chikkodi and Bengaluru via Nipani, Sankeshwar, Belagavi, Dharwad, and Hubballi. This upgraded overnight service provides

NWKRTC Operates New Premium ‘Rajaratha’ AC Sleeper Bus Service Connecting Chikkodi, Belagavi, and Bengaluru Read More »

Belagavi Station Ranks 12th in SWR Network with Over 56 Lakh Annual Passengers

According to official South Western Railway (SWR) performance figures for the 2025–26 financial year, Belagavi Railway Station (BGM) has consolidated its position as one of North Karnataka’s premier rail transit nodes, recording a total annual footfall of over 5.65 lakh

Belagavi Station Ranks 12th in SWR Network with Over 56 Lakh Annual Passengers Read More »