Under the newly approved ‘Karnataka Road Network Grid Plan’, Belagavi district has secured the lion’s share of the state government’s infrastructure push, with a massive 25 towns and semi-urban centers designated for comprehensive ring road developments and economic impact zones.
The ambitious policy, sanctioned by the Karnataka Cabinet, targets 108 tier-2, tier-3, and taluk-level centers across the state. Each selected town will feature a 30-meter (100-foot) wide peripheral ring road coupled with a 2 km regulated Impact Zone on either side to encourage organized industrial, residential, and logistics expansion while curbing unauthorized construction.
Spotlight on Belagavi District (25 Centers)
Accounting for nearly a quarter of all approved locations statewide, Belagavi’s extensive border trade, sugar industry belt, and agro-processing hubs will receive dedicated bypass corridors to ease severe inner-city bottlenecks.
- Major Taluk & Commercial Hubs: Athani, Hukkeri, Khanapur, Raybag
- Towns & Rural Commercial Centers: Ankalagi, Arakeri, Borgaon, Chimcholi, Eksamba, Ghataprabha, Harugeri, Kabbur, Kagwad, Kalloli, Kankanawadi, Konnur, M.K. Hubballi, Mugalkhod, Munavalli, Naganur, Sadalga, Shedbal, Ugar-Khurd, Yaragatti
Other Districts Covered Under the Grid Plan (83 Centers)
Beyond Belagavi, the infrastructure plan extends across North, Central, and South Karnataka, distributed by district as follows:
- Vijayapura (9): Alamatti, Babaleshwar, Chadchan, Devara Hipparagi, Kolhar, Muddebihal, Nalatawad, Nidagundi, Tikota
- Raichur (7): Balaganur, Deodurg, Hatti, Kavital, Mudgal, Sirwar, Turvihal
- Kalaburagi (5): Chincholi, Jevargi, Kalgi, Kamalapur, Yadrami
- Koppal (5): Kanakagiri, Karatagi, Kuknoor, Kushtagi, Tavargera
- Shivamogga (5): Holehonnur, Hosanagara, Jog-Kargal, Shiralakoppa, Thirthahalli
- Uttara Kannada (5): Ankola, Jali, Manki, Mundgod, Yellapur
- Gadag (4): Gajendragad, Mulgund, Mundargi, Naregal
- Haveri (4): Bankapur, Guttal, Hirekerur, Rattihalli
- Mandya (4): Bellur, Krishnarajapete (K.R. Pete), Nagamangala, Pandavapura
- Vijayanagara (4): Hagari Bommanahalli, Huvina Hadagali, Kotturu, Kudligi
- Yadgir (4): Gurumitkal, Hunsagi, Kakkera, Kembhavi
- Bagalkote (3): Aminagad, Bilagi, Lokapur
- Dharwad (3): Alnavar, Annigeri, Kalghatgi
- Mysuru (3): Bannur, H.D. Kote, Saragur
- Ballari (2): Kurugodu, Tekkalakote
- Chamarajanagar (2): Hanur, Yelandur
- Chikkamagaluru (2): Mudigere, Sringeri
- Chitradurga (2): Molakalmuru, Nayakanahatti
- Dakshina Kannada (2): Kadaba, Kinnigoli
- Tumakuru (2): Gubbi, Huliyar
- Bidar (1): Hallikhed
- Chikkaballapur (1): Gudibande
- Hassan (1): Alur
- Kodagu (1): Ponnampet
- Kolar (1): Srinivaspur
- Udupi (1): Byndoor
Core Objectives of the Statewide Rollout
- Direct Flow Around Urban Cores: The 100-foot ring roads will reroute regional freight traffic away from congested central markets and taluk administrative zones.
- Green Belts & Buffer Norms: Tree-planting corridors and regulated construction within the 2 km buffer zone are intended to prevent unchecked sprawl while maintaining environmental buffers.
- Balanced Regional Economic Growth: Providing planned logistics corridors at taluk points aims to retain local economic activity and gradually ease demographic pressures on Bengaluru.





